Onsite at the build, everyone was in the parking lot when I finally had enough manpower to lift the walls. That just meant we had to carry them an extra 10 or so metres, which is okay with four people per wall - two people is a shuffle dance at a distance of 1-2m only.
So the walls went up, the 150mm galv coach screws went into the sills to the subfloor, and a few nails gunned into the sides of the walls for good luck.
I still have the make the cantilevered 2nd floor but that's another mission for another day.

Here you can see the strap bracing in most of it's glory (forgot a progress report pic as I was too busy entertaining friends (read: talking too much) and getting them to help move the 6m lengths of 2x4s I had "resting" on my stairs. Unfortunately this was the only place I could 'hide' them and they got a bit warped over the two weeks they sat there. Really annoying but hey it's my fault, and I hope I learn from my mistakes! The 2x4s that are visible in the doorway are half my roof purlins - leftovers put to good use - and I'm sourcing 2x2s for the rest of them.
I also got the loft bed subfloor cut and my friend came over to help me try and put it together. Well, we did put it together. But it is seriously warped. So to fix it I'm borrowing two of my flatmate's 5kg dumbbells and weighing down the high ends.. Hopefully it rains overnight and it will start looking to be a better shape, but I can put it in the trailer like that tomorrow to flatten it further. I also spent $30 buying more galv brackets and screws so the bed is fully supported both sides.

I'm a bit interested to see how much extra work the loft area will be.. I have a strange angled window I can put near my head - I did get the angle close enough to fit it accurately without it looking odd, but the amount of extra work might make it not worth it. Especially since there is a 600mm square opening window on the loft bit above the massive window pictured. Once the loft floor is installed it will probably be easier to tell. But my biggest concern is that as the back plate is made, the floor may need to be notched. Mildly disturbing but I don't have the manpower to find out just yet.
My next main mission is to start cutting the plasterboard for the stairs - which are to be made out of those boxes on the bottom left of the picture just above. Got them free from the neighbours' wood pile, enough to make all my stairs and then a couple of 6x9 holders to boot.
All my window flashing arrived this week too. Turns out the roofing place are worse with a tape measure than me, and NONE of their measurements are correct. Thankfully there is more than I need, not less, so just another annoying tin snip and angle grinder with cut off blade exercise. Took it in to get them to fix one (it was 1220mm, meant to be 605mm..!) and it took them forever and they were cutting by hand so I gave up before they could cut the rest.
Better go finish putting up this building paper so I can put the tarp on the roof. My flatmate's dad is coming over in a few weeks and has offered to install my roof - yay! Already at 4.2m, the walls are too high for me to work on easily so I'm glad to have some professional help from someone who knows what they are doing!! Okay better get back to work. JAYA JAGANNATHA!